Sample project for layout. Replace with a real UNOF job before launch.
The brief
Repair the ground floor after a burst pipe soaked the walls and floors.
What we did
- Dried out the walls and subfloor
- Removed damaged plaster and flooring
- Treated for mould before rebuilding
- Replastered, refloored and decorated




